Customization: | Available |
---|---|
After-sales Service: | 1year |
Warranty: | 1year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
No. | Name | Qty | Remarks |
1 | Electrical control room | 1 | ≤9300mmX3000mmX2900mm |
2 | Ring main unit | 2 | One set 10kV, One set6.3kV, with metering |
3 | Voltage changer | 1 | 800kVA AC10kV,6.3kV/400V |
4 | High voltage cable and accessories | 1 | |
5 | Switch cabinet | 1 | 400V |
6 | Active filter cabinet | 1 | 400V 100A |
7 | Drawworks frequency converter cabinet | 1 | Domestic mature brands |
8 | Touch screen | 1 | |
10 | PLC | 1 | Siemens |
11 | Driller operation control system | 1 | Includes control buttons and handles |
12 | 400V Junction cabinet | 1 | |
13 | MCC cabinet | 1 | |
14 | Plug-in cabinets | 1 | Including connectors (including 200A), copper bars are used for currents above 200A, and copper bars need to be protected |
16 | Main vehicle explosion-proof cabinet | 1 | (Provided by the supplier) |
17 | Integrated hydraulic station explosion-proof cabinet | 1 | ≥37kw motor, Voltage-Drop Starting (including hydraulic oil tank heat tracing control) (provided by the supplier) |
19 | Lighting lamps | 1 | The main vehicle, drill floor and mast adopt DC24V. |
20 | Lighting explosion-proof control box | 1 | (provided by the supplier) |
21 | Power and control cables | 1 | Including the electrical control room and well site (low temperature), the cable from the electrical control room to the main vehicle is 40 meters, and the cable from the electrical control room to the driller's room is 60 meters. |
22 | Cable tray | 1 | From the electrical control room to the main vehicle (with a total length of 50 meters, divided into three specifications of 2m, 4m, and 6m, including 2 sets of 90°elbow cable trays, ensuring smooth contact between cables and cable trays) |
23 | Grounding system | 1 |